Photos of the arrival of the new cluster Stallo November 6, 2007, and the following installation process.

 Arrival of the truck with Stallo sealed inside
 Arrival of the truck with Stallo at the University of Tromso, November 2, 2007. The truck driver and Per Mosand (right) from HP.

 Breaking the seal
Breaking the seal of the truck with Stallo onboard.

Unloading Stallo (5) 
Unloading Stallo outside the University of Tromsoe.

Unloading Stallo (5) 
The doorway was only just big enough for Stallo.

Unpacking Stallo (2)
Removing the packaging of Stallo.

 Power on
The first power cables in place.

 Water cooling (1)
The water cooling of Stallo.

Switch
A big switch for a big cluster. 

Stallo's first part in place (1) 
The first racks of Stallo in place.

Installing crew (3)
Quite a lot of people took part in the installation process of Stallo.

Installing crew (6) 
The installation crew on top and on the other side of Stallo.

Racks in place
A bit closer to the end of the installation of Stallo, November 8, 2007.

Document Actions