From a storeroom to a machine room
Photos of the original storeroom at four different dates, as well as a sketch and a technical drawing of the new machine room.
|
|
|
An inspection May 15, 2007, of the storeroom that were to be transformed into the new machine room. |
![]() |
|
Quite a few things had to be removed first, May 15, 2007. |
![]() |
|
An overview of the machine room July 13, 2007. |
![]() |
|
Details by the floor July 13, 2007, showing the entrance of the water pipes. |
![]() |
|
The entrance of the machine room July 13, 2007, with holes in the wall for the cabels. |
![]() |
|
An overview of the machine room August 27, 2007, with the floor and the cable rails in place. |
![]() |
|
The water pipes under the floor August 27, 2007. |
![]() |
|
The water pipes in the hallway outside the machine room August 27, 2007. |
![]() |
|
Water-cooling pipes underneath the floor October 19, 2007. |
![]() |
|
The water-cooling system is tested during October 2007. |
![]() |
|
Cable gates in the ceiling October 19, 2007. |
![]() |
|
The switch-board October 19, 2007. |
![]() |
|
The machine room is finished with only a few more tests left to do, October 31, 2007. |
![]() |
|
An overview of the new machine room, October 31, 2007. |
|
|
The inauguration of the machinehall took place in the evening Friday November 2, 2007. |
![]() |
|
A sketch of the new machine room, with a basal area of 14.4*7 square meter and a height of 3.8 meters. |
![]() |
|
A technical drawing of the new machine room. |